2020/6/13 23:40:38

How to custom printed +custom rubber bracelets

lothing, watches, travel supplies, scarves, sunglasses, perfume, fashion jewelry and so on. Coach products are sold worldwide through brand boutiques, designated department stores, specialty stores and official websites. We can make the bracelet color black with the logo white, just like the logo of Coach. It’s the classical one. To be personalized, we can make the wristband and logo with all pantone colors and we can make it other smart options. Like glow in the dark. The wristband can glow in dark for 3 hour once it absorb enough light energy. So it is best for night walk or game at night. Or it can be UV transfer. The UV wristband will transfer its color from transparent to blue or purple in the sunshine outdoor.  

le and comfortable to wear. And also most importantly, it is easy way to meet the request. It shows up a slogan and logo. We can match all the pantone colors, for the band color and logo color. The band can be solid, segment, swirl, glowing and UV transfer. Glowing wristband can glow several colors, it is the best for night event like bar party, concert or night walk. We can make it with the club theme. A glow in dark silicone wristband can glow green or blue after absorbing strong light energy under the effect of phosphor which is very small amount added and green to human. The glow will fade gradually in about 3h depending on how much light it absorbs. The logo can be same as regular debossed, embossed or printed on the glowing wristbands. After exposure to natural light, fluorescent light, and ultraviolet light, the phosphor can store the light energy, stop the light and release it slowly in the way of fluorescence, so the light can still be seen at night or in the dark, lasting for hours to more than ten hours.    

production process of silicone wristband, it is estimated that not many people have fully understood it. Pinshang Silicone explains the whole production process of silicone wristband. Design of artwork The design of artwork is generally based on the size of the sample artwork provided by the customer. Graphic drawing software, such as CDR or AI software, is generally used to make the artwork. If the customer cannot provide the sample artwork, we can cooperate with the customer to complete the design and production of the artwork free of charge according to the customer"s requirements. Open mold The mold opening is that the mold master creates an offset plate according to the designed artwork, then uses the offset plate to carve a copper worker, and finally carves a steel mold with the copper worker. Some hand ring craft moulds have a relatively high technical content and take a relatively long time to produce. Generally, the mold opening period is calculated by five days. With the mould, the production will be quick. Toner refining According to the color number on the international Pantone color card specified by the customer, our color mixing ratio is aligned and the color difference is minimal. Approval materials The materials required for each wristband are weighed by an electronic scale. Generally, the wristband weighs about 5.5 grams. Upper die production After the mould is finished, it is produced on the machine. After the mold is installed, the machine needs to be warmed up. A 9-mold machine produces about 15000 pieces per day. Quality inspection After the wristband is produced, the product shall be inspected and checked, mainly to see if it meets the specifications. If it does not meet the specifications, it will be discarded. deburring Each wristband is produced with a residual edge. Afcustom rubber braceletster the quality inspection department passes the inspection, the product is sent to custom rubber braceletsthe post-process department for trimming. (Average trimming quantity per person per day is about 3,000 pieces). Finished product inspection After the edge is repaired, the finished product is obtained. It is also necessary to send the finished products back to the quality inspection department to check the trimming quality. If there are any unqualified products, they will be scrapped. Packaging After the repaired products pass the inspection, they shall be packaged according to the customer"s requirements. Packaging is divided into PP bag independent packaging and naked packaging. Both are 100 pieces in a pack. Usually 20 packs per carton (2,000 pieces) are standard export containers. Packing is generally required by customers. Inspection before sealing After the packaging is completed, the quality inspection department will check the quantity. if there is no problem, seal the case and send it to the warehouse for delivery.             silicone-wristbands-size-chart

how to make a paracord bracelet with 2 colors